12789 Kcg Kt Sf Exp Train

12789 • Kcg Kt Sf Exp

MTWTFSS

KCG

Kacheguda

1d 8h 35m

KT

Kumta

Complete station schedule

StationArrDepDuration
KachegudaKCG--06:050m
JadcherlaJCL07:0907:101h 4m
MahbubnagarMBNR07:2807:301h 23m
Gadwal JnGWD08:3908:402h 34m
Kurnool CityKRNT09:4509:473h 40m
DhoneDHNE11:0011:054h 55m
GootyGY11:5812:005h 53m
Yerraguntla JnYA13:3313:357h 28m
Cuddapah JnHX14:0814:108h 3m
Renigunta JnRU16:4016:5010h 35m
Katpadi JnKPD19:1019:1513h 5m
Jolarpettai JnJTJ20:3520:4014h 30m
Salem JnSA22:0722:1016h 2m
Erode JnED23:1023:1517h 5m
TiruppurTUP23:5623:5817h 51m
Coimbatore JnCBE00:5701:0018h 52m
Palakkad JnPGT02:3202:3520h 27m
Shoranur JnSRR03:2503:3021h 20m
TirurTIR04:0804:1022h 3m
KozhikkodeCLT04:5204:5522h 47m
VadakaraBDJ05:2905:3023h 24m
ThalasseryTLY05:4805:5023h 43m
KannurCAN06:1706:201d 12m
PayyanurPAY06:4806:501d 43m
NileshwarNLE07:1007:111d 1h 5m
KanhangadKZE07:1807:201d 1h 13m
KasaragodKGQ07:4307:451d 1h 38m
Mangaluru CntlMAQ09:1509:301d 3h 10m
SurathkalSL10:3210:341d 4h 27m
MulkiMULK10:4410:461d 4h 39m
UdupiUD11:4011:421d 5h 35m
BarkurBKJ11:5411:561d 5h 49m
KundapuraKUDA12:1012:121d 6h 5m
Mookambika RoadBYNR12:5612:581d 6h 51m
BhatkalBTJL13:2013:221d 7h 15m
MurdeshwarMRDW13:3613:381d 7h 31m
KumtaKT14:40--1d 8h 35m
Book now

Route Summary

Train 12789 Kcg Kt Sf Exp departs Kacheguda at 06:05 and arrives Kumta at 14:40, covering 1809 km in 1d 8h 35m.

  • 06:05 KCG

    Departs

  • 14:40 KT

    Arrives

  • 1809 km

    Distance

  • 1d 8h 35m

    Duration

Kcg Kt Sf Exp — Route & Schedule

View the complete station-wise schedule for train 12789 Kcg Kt Sf Exp between Kacheguda (KCG) and Kumta (KT). Timings, halts, and distance are listed in the table above.

Key terms in Train Name

  • Departure time

    The scheduled time at which a train is set to leave a station. Departure times in the timetable are fixed by Indian Railways and remain constant unless the schedule is officially revised. Always check the departure time for your boarding station before travelling.

  • Arrival time

    The scheduled time at which a train is expected to reach a particular station. The arrival time listed in the train time table represents the planned schedule. For origin stations, the arrival time column shows a dash (-) since the train starts its journey there.

  • Platform No.

    The train platform number shows the designated platform at a station where a train arrives or departs. Knowing the correct train platform number helps you reach the right spot before the train pulls in. Platform numbers are displayed in the Cleartrip timetable as a guide: Indian Railways may change the platform on the day of travel, so always verify on station display boards upon arrival.

  • Origin

    The starting station from which a train begins its journey. The origin station shows no arrival time in the timetable (marked as -) since the train originates there. Distance is always 0 km at the origin, and the journey day count starts from this point.

  • Destination

    The final station at which a train's journey ends. The destination shows no departure time (marked as -) since no onward journey is scheduled. The cumulative distance shown at the destination equals the total route length of the train.

Explore more on Cleartrip